construction Project
VALE/cianbro
The Challenge
This project involved the construction of industrial rated modular electrical distribution centers for a large remote mining facility.
The Solution
We worked in collaboration with Cianbro at their Maine-based manufacturing facility and installed approximately 1200 tons of cooling capacity throughout 22 modules that were then shipped their their owner in Newfoundland and Labrador, Canada.
The Results
By performing the construction locally, we were able to significantly keep costs down, saving the mining facility thousands of dollars.